ONDEL

VILLE DE MONTRÉAL

Dorval drinking water plant electrical work

Short description

Start of work: September 2020
End of work: April 2022

ONDEL was called upon by the City of Montréal to perform major electrical work for one of their projects. They were asked to prioritize the refurbishment of the Dorval drinking water plant in two phases, which included a new 25 kV electrical installation and generator sets and their distribution on a nominal 600 V load. This was to be designed while still allowing the plant to be operational.

Donald Pelletier 

dpelletier@ondel.ca 

418.664.1066

www.ondel.ca

$5M

Contact

For your specific submissions
and requests regarding our company